User Tools

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
geoscene3d:tools:gridmosaic [2020/02/24 20:21] – created rebecca130301_gmail.comgeoscene3d:tools:gridmosaic [2021/01/06 19:11] (current) – external edit 127.0.0.1
Line 5: Line 5:
 ==== Requirements ==== ==== Requirements ====
  
-=== Module ===+=== Data ===
  
-Editor Versions Only???:?:+To be able to mosaic grids in the Toolbox, make sure that the grids have the same grid cell size. In this case, we want to load terrain models from an area in the Toolbox, mosaic the grids and then the outcome is one terrain model covering all test areas.
  
-=== Data === 
  
-To be able to mosaic grids in the Toolbox, make sure that the grids have the same grid cell size. In this case, we want to load terrain models from an area in the Toolbox, mosaic the grids and then the outcome is one terrain model covering all test areas.\\+{{vimeo>491134063?large&autoplay|Video Tutorial}} 
 ---- ----
- 
  
 ==== Step 1. Load and mosaic the grids in the GeoScene3D Toolbox ==== ==== Step 1. Load and mosaic the grids in the GeoScene3D Toolbox ====
Line 27: Line 26:
 {{:tutorials:themecalc:b3c1362cdab554910773fab53d393b1f.png}}\\ {{:tutorials:themecalc:b3c1362cdab554910773fab53d393b1f.png}}\\
 \\ \\
-**NOTE:** The input grid files can be joined to one grid with the use of 5 sample methods (“Mean”, “Max”, “Sum”, “Top” and “Min”). Each sample method is described in the GeoScene3D online help system (press F1 when the “Resample and Mosaic” dialog box is open). Only when the sample method "Top" is selected, the order of the grids, below “Grid Files”, is significant. Use the Up and Down buttons to organize the grid files. The grid with the highest priority should be placed at the top of the dialog box then.\\+**NOTE:** **The input grid files can be joined to one grid with the use of 5 sample methods (“Mean”, “Max”, “Sum”, “Top” and “Min”). Each sample method is described in the GeoScene3D online help system (press F1 when the “Resample and Mosaic” dialog box is open). Only when the sample method "Top" is selected, the order of the grids, below “Grid Files”, is significant. Use the Up and Down buttons to organize the grid files. The grid with the highest priority should be placed at the top of the dialog box then.** \\ 
 +\\
 In this case, the sample method is “Mean”.\\ In this case, the sample method is “Mean”.\\
 \\ \\
Line 40: Line 40:
 9. A new grid (GridMosaic.grd) covering the area of the 3 grids (TopKalk.grd, Bund_Lag5_hydr.grd and TopLag3_hydr.grd) is generated and added to the GeoScene3D Toolbox.\\ 9. A new grid (GridMosaic.grd) covering the area of the 3 grids (TopKalk.grd, Bund_Lag5_hydr.grd and TopLag3_hydr.grd) is generated and added to the GeoScene3D Toolbox.\\
 {{:tutorials:themecalc:9d4a21f81f74d8af56d384f730d4e0e7.png}} {{:tutorials:themecalc:9d4a21f81f74d8af56d384f730d4e0e7.png}}
- 
  
 ==== Step 2. Load the grid in the GeoScene3D ==== ==== Step 2. Load the grid in the GeoScene3D ====
Line 50: Line 49:
 The grid (GridMosaic.grd) is loaded in GeoScene3D.\\ The grid (GridMosaic.grd) is loaded in GeoScene3D.\\
 {{:tutorials:themecalc:d3bbfb77ada545b8cd9057e8d9aaa9cc.png}} {{:tutorials:themecalc:d3bbfb77ada545b8cd9057e8d9aaa9cc.png}}
- 
  
  

This website uses cookies. By using the website, you agree with storing cookies on your computer. Also, you acknowledge that you have read and understand our Privacy Policy. If you do not agree, please leave the website.

More information