Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
geoscene3d:hydro_calculations:drawdowntheiscalculation [2020/11/16 13:58] – gs3d | geoscene3d:hydro_calculations:drawdowntheiscalculation [2023/09/27 13:52] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
This tool can be used for estimating draw down calculations e.g. when evaluating extraction permits especially when desiring to establish a new well. In addition, the module can be used as a screening tool within a wide range of groundwater-related tasks, including drinking water, industrial irrigation, geotechnics, | This tool can be used for estimating draw down calculations e.g. when evaluating extraction permits especially when desiring to establish a new well. In addition, the module can be used as a screening tool within a wide range of groundwater-related tasks, including drinking water, industrial irrigation, geotechnics, | ||
Line 28: | Line 28: | ||
1. Open the menu “Hydro” and click the “Drawdown Theis Calculation” to open the calculation page.\\ | 1. Open the menu “Hydro” and click the “Drawdown Theis Calculation” to open the calculation page.\\ | ||
- | {{: | + | {{: |
\\ | \\ | ||
2. Select the different opportunities for pump parameters and output. You can see an explanation of all the functions in the table below.\\ | 2. Select the different opportunities for pump parameters and output. You can see an explanation of all the functions in the table below.\\ | ||
Line 77: | Line 77: | ||
{{: | {{: | ||
{{: | {{: | ||
- | |||
- | \\ | ||